Plumbing & Restroom Build-Outs in Chicago, New York & Miami

Accessible restrooms, break rooms, and commercial plumbing tied into existing building systems.

Overview

Plumbing is one of the least flexible parts of a tenant improvement. Fixtures have to reach existing waste stacks with enough slope, new restrooms have to meet accessibility requirements, and in multi-story buildings the work often has to be coordinated with the tenant below. Where plumbing can go should be settled before the floor plan is finalized.

We build and renovate restrooms, break rooms, pantries, and specialty plumbing for commercial tenants, with licensed plumbers working under the general contract. Restroom layouts are checked against the 2010 ADA Standards for clearances, grab bars, fixture heights, and turning space, and fixture counts are confirmed against the occupancy the space is permitted for.

Each market has its own rules to follow: Chicago has its own plumbing code, New York City work follows the NYC Plumbing Code, and Florida projects follow the Florida Building Code, Plumbing. Restaurant and medical tenants often add grease interceptors, hand sinks, or specialty drainage that must be designed in early.

What's Included

Our Process

Industries, Service Areas & Related Services

We provide plumbing & Restroom Build-Outs for every industry we serve, throughout Chicago, New York, and Miami, as part of a complete tenant improvement managed under one general contract.

Related services: ADA Compliance Upgrades, Restaurant Construction, Healthcare Construction. See all services.

Frequently Asked Questions

Restrooms built or altered as part of a commercial project are generally required to comply with accessibility standards. Existing restrooms that serve an altered area may also need upgrades, which is worth reviewing before design is finalized.
Location is limited by access to existing waste stacks and the slope needed to reach them. Restrooms placed far from stacks may need raised floors, pumps, or work in the space below, all of which add cost.
Required fixture counts depend on the occupancy type and permitted occupant load. We confirm the count with the design team during planning.

Ready to Plan Your Restroom Build-Out?

Tenant Improvement General Contractors

Licensed commercial general contractor serving Chicago, New York, and Miami.

866-646-7605

© 2026 Tenant Improvement General Contractors. All rights reserved.